I have spent ages sorting out the garage. Four trips to the tip and the spare room is still full of stuff, as is the shed and some of the garden. I've used 35 litres of masonary paint on the walls, 5 litres of bathroom ceiling paint, 5 litres of floor sealant and 10 litres of floor paint. It's taken about 30 hours of work in total. I've now got 460W of lighting in the garage and some proper storage and a decent work bench at last.