 |
 |
|
 |
 |
|
 |
 |
|
 |
 |
|
 |
 |
|
 |
 |
|
 |
 |
|
 |
 |
|
 |
 |
|
 |
|
 |
Last page update was 07 Mar 2007 |
 |
|
 |
Fisher Fury Build Progress - December 2006
3rd December
Fitted front light connectors.
17th December
|
Fitted a bracket to the chassis for the bonnet support. This is going to have an aluminium rod on the end of a male rod-end.
|
17th December
|
Still also using these odd five minutes (I'm really struggling to get into the garage at with all the Christmas preparations going on ) to get the bodywork graphics resolved. I've got a friend at work who has a sideline in vinyl graphics which is handy.
|
I also thinking of cutting a chunk out of main tub one the bottom rear edge, to make access to things easier and to allow me to fabricate and fit an aluminium diffuser.
27th December
Finished wiring and testing the front lights.
28th December
Fabricated a bonnet support rod/bracket.
30th December
Just heard that Martin Bell has been in hospital with a subdural haemorrhage. My best wishes go to him and his family. Martin is a very genuine person and a real enthusiast and I wish him a speedy recovery.
Next month
 |
 |
|
 |
 |
|
 |
 |
|
 |
 |
|
 |
 |
|
 |
 |
|
 |
 |
|
 |
 |
|
 |
 |
|
 |
|
 |
Copyright © Robert Collingridge 2004 |
 |
|
 |